Contact Number
17749472477/ 0393-8903-977
Puyang Shengdong New Energy Co. Ltd
Address:200 meters east of the intersection of Xindong Road and Weidu Road, Hualong District, Puyang City
TEL:0393-8903-977
Email:1318264254@qq.com
Author: Release time:2021-05-28 15:21:54Click:852
The total gas emission from coal mining in 2007 was 17.661 billion cubic meters, of which the ground drainage volume was 4.4 billion cubic meters, and the air discharge volume was 13.261 billion cubic meters; in the drainage volume. The used coalbed methane is 1.45 billion cubic meters, accounting for 32.95%; the unused extracted coalbed methane resources are 2.95 billion cubic meters.
The total gas emission from coal mining in 2007 was 17.661 billion cubic meters, of which the ground drainage volume was 4.4 billion cubic meters, and the air discharge volume was 13.261 billion cubic meters; in the drainage volume. The used coalbed methane is 1.45 billion cubic meters, accounting for 32.95%; the unused extracted coalbed methane resources are 2.95 billion cubic meters. If you add about 25% of the gas that can be used in the air exhaust gas (the gas concentration is 0.5%), the potential resource that can be used in this part is 3.3 billion cubic meters. According to the current plan, by 2010 and 2012, the total coalbed methane extraction volume will reach 6 billion cubic meters and 7 billion cubic meters. If fully utilized, 7.38 million tons of standard coal and 86.1 million tons of standard coal can be saved; If the air exhaust gas with a concentration of 0.5% or more is used, the potential usable volume is 3.3 billion cubic meters and 3 billion cubic meters, which is equivalent to 4.06 million tons of standard coal and 3.68 million tons of standard coal.
Under standard conditions, 1 cubic meter of pure gas can generate about 3.5 kWh. Build a gas transmission system with a pipe diameter of DN500 mm and a length of 200 meters, which can be used for 6 500KW gas generator sets to generate electricity. The project investment is about 8.5 million yuan, and the annual operating cost is about 2.18 million yuan. The annual power generation capacity is 18.14 million kilowatt-hours, the annual electricity fee income is about 6.53 million yuan, and the investment recovery period is less than 2 years. When the waste heat of the gas generator set is utilized, an additional investment of about 440,000 yuan is required, and the annual income is about 10 million yuan.
It can be seen that the utilization of coal mine gas for power generation is an industry with low investment, low risk, short payback period and obvious comprehensive benefits, and the market prospect is broad.
Hotline
17749472477
Working hours
Monday to Friday
Work phone
0393-8903-977